Conveyor operations software for industrial teams worldwide
BeltLabs

Industry 05 / 09

Coal, biomass, limestone, gypsum and ash-handling systems

BeltLabs for Power generation

Keep fuel and by-product routes ready for the generation plan.

Generation sites depend on fuel conveyors feeding bunkers and on by-product routes clearing ash or gypsum. BeltLabs separates each duty, keeps redundancy and outage context visible, and preserves the inspection and work evidence used to return a route to service.

Coal conveyors feeding a power station
Power station · coal stockyard and bunker-feed conveyorsTikilucas · CC BY-SA 4.0

Material route

  1. 01

    Fuel receival

  2. 02

    Stockyard and reclaim

  3. 03

    Bunker feed

  4. 04

    Ash and by-product handling

Service priorities

What the belt team has to control.

Who uses it

Fuel-handling operations, maintenance planners, outage teams, reliability and service contractors

05.1

Duty and standby routes

Keep operating status and open work clear across redundant conveyors and transfer points.

05.2

Planned unit outages

Align belt work, crews, isolations and materials with the wider generation outage program.

05.3

Dust and fire controls

Attach inspection evidence and required safety controls to fuel-handling work orders.

05.4

Aging infrastructure

Preserve repeat defects, repairs and component history against the exact route and asset.

Conveyor and belt records

The operating detail that matters in power.

Keep conveyor assets, belt construction, splice history, inspection findings and completed maintenance evidence connected to the route they support.

Records to bring together

  • Fuel, limestone, gypsum or ash duty
  • Duty/standby route and transfer relationship
  • Fire, dust and housekeeping observations
  • Unit-outage work pack and isolation context
  • Repair evidence and return-to-service approval

Common belt workflows

  • Fuel-route registers
  • Unit outage work
  • Duty/standby visibility
  • Dust-control inspections
  • Ash conveyor history
  • Maintenance handback
Recommended first workflow

Choose one bunker-feed or reclaim route, verify the asset hierarchy and close one outage inspection with its safety and handback evidence.

Related BeltLabs solutions

Use one record across the route.

Built for Power

Bring the accountable team and the belt record into one workspace.

Create a workspace around the operation you manage. The guided setup helps authorised customers configure their own records after sign-up.