Conveyor operations software for industrial teams worldwide
BeltLabs

Industry 08 / 09

Coke handling, storage, rail loadout and marine terminals

BeltLabs for Refineries & petroleum coke

Control petroleum-coke handling as a regulated bulk route.

Bulk solids appear in refinery operations where petroleum coke is cut, crushed, conveyed, stored and loaded for rail or export. BeltLabs keeps those conveyors and transfer points connected to dust controls, access permits, contractor work and defensible close-out records.

Petroleum coke stockpile at an industrial site
Petroleum coke · regulated bulk storage and transferUnited States EPA · public domain

Material route

  1. 01

    Coke cutting and dewatering

  2. 02

    Crusher or sizer

  3. 03

    Covered transfer and storage

  4. 04

    Rail or marine loadout

Service priorities

What the belt team has to control.

Who uses it

Refinery maintenance, terminal operations, environmental teams, contractor coordinators and belt-service crews

08.1

Controlled dust

Keep enclosure, suppression, skirting and housekeeping findings with the exact conveyor and transfer point.

08.2

Permit-led access

Carry isolation, gas-test and contractor access requirements with the work order.

08.3

Regulated storage

Retain dated evidence for conveyor work and corrective actions around coke storage and loadout.

08.4

Contractor accountability

Record who performed the repair, the approved scope, parts used and operational handback.

Conveyor and belt records

The operating detail that matters in petroleum coke.

Keep conveyor assets, belt construction, splice history, inspection findings and completed maintenance evidence connected to the route they support.

Records to bring together

  • Petroleum-coke route and transfer hierarchy
  • Enclosure, suppression and housekeeping findings
  • Permit, isolation and access requirements
  • Contractor qualifications and assigned work
  • Repair evidence and regulated close-out record

Common belt workflows

  • Petroleum-coke route registers
  • Dust-control inspections
  • Permit-linked work
  • Contractor records
  • Storage evidence
  • Rail and marine loadout work
Recommended first workflow

Load one coke-handling route and use one transfer-point or belt repair to confirm the permit, dust-control and handback record.

Related BeltLabs solutions

Use one record across the route.

Built for Petroleum coke

Bring the accountable team and the belt record into one workspace.

Create a workspace around the operation you manage. The guided setup helps authorised customers configure their own records after sign-up.